KES / Company profile / 2026
Komenergoservice
We design and modernise heat supply systems. From an engineering concept to installation, commissioning and operator training.
A concise company introduction. The button opens your browser’s print dialogue, where you can select “Save as PDF”.
2006company established
13modular boiler units in the GIZ 2025 programme
38 MWthermal capacity within that programme
Capabilities
Modular boiler plants · Combined heat and power · Engineering design and preparation · Boiler plant and heat network modernisation · Commissioning, training and service.
Selected projects
| Project | Period | Scope and role |
|---|---|---|
| 13 modular boiler units for Ukrainian communities | 2025 | A decentralised heat supply programme: 13 modular boiler units with a combined thermal capacity of 38 MW at 11 addresses. Delivery of modular boiler works within the contracted programme. |
| Gas boiler plant on Bazhenova Street, Vinnytsia | 2014–2016 | Construction and reconstruction of the gas boiler plant at 15a Bazhenova Street. Three boilers with a combined thermal capacity of 18 MW. Works delivered as a consortium participant with Viessmann. |
| Heating design and tender documentation for Kherson | 2017–2019 | Preparation of design and tender documentation for district heating modernisation. The scope covered 15 boiler plants, 13 individual heat substations and 8,816 metres of heat networks. Documentation prepared in consortium with COWI. |
| Boiler plant reconstruction in Horishni Plavni | 2019 | Reconstruction of the boiler plant at 31 Enerhetykiv Street. The project covered four 30 MW boilers delivered in two phases. Consortium participant with KOTLOGAZ and KOMFORTS (Latvia). |
| Heat network connection between boiler plants in Irpin | 2023–2025 | A heat network project connecting two boiler plants in Irpin, at 25 Ninth Line Street and 7 Pokrovska Street. Design, supply and construction works within the contracted scope. |
| Modular boiler plant for School No. 4 in Shostka | 2025–2026 | A new natural-gas modular boiler plant with a thermal capacity of 3.8 MW for School No. 4 in Shostka. Delivery of a new modular boiler plant within the agreed contract. |
Figures are based on company materials and the ReBuild presentation dated 21 October 2026. Scope and role are stated for each project.