UNICEF · Social infrastructure
Modular boiler plant for School No. 4 in Shostka
A new natural-gas modular boiler plant with a thermal capacity of 3.8 MW for School No. 4 in Shostka.
Schematic illustration of the engineering scope.
- Period
- November 2025 — February 2026
- Funding
- UNICEF
- KES’s role
- Delivery of a new modular boiler plant within the agreed contract.
ShostkaThe task and
The task and
engineering context
Practical experience in developing a dedicated heat source for an educational facility.
Period and status follow the company presentation dated 21 October 2026.
Scope of works
- A 3.8 MW gas-fired modular boiler plant.
- Social infrastructure facility: School No. 4.
- Works delivered within the contracted scope.
Figures are based on company materials and the ReBuild presentation dated 21 October 2026. Scope and role are stated for each project.