UNICEF · Social infrastructure

Modular boiler plant for School No. 4 in Shostka

A new natural-gas modular boiler plant with a thermal capacity of 3.8 MW for School No. 4 in Shostka.

Schematic illustration of the engineering scope.

Period
November 2025 — February 2026
Funding
UNICEF
KES’s role
Delivery of a new modular boiler plant within the agreed contract.
Shostka

The task and
engineering context

Practical experience in developing a dedicated heat source for an educational facility.

Period and status follow the company presentation dated 21 October 2026.

Scope of works

  • A 3.8 MW gas-fired modular boiler plant.
  • Social infrastructure facility: School No. 4.
  • Works delivered within the contracted scope.

Figures are based on company materials and the ReBuild presentation dated 21 October 2026. Scope and role are stated for each project.

A facility. A challenge.
A practical solution.

Tell us what your municipality or business needs. Let’s start with an engineering conversation.

Discuss a project
Call our teamDiscuss a project