World Bank · Engineering design

Heating design and tender documentation for Kherson

Preparation of design and tender documentation for district heating modernisation. The scope covered 15 boiler plants, 13 individual heat substations and 8,816 metres of heat networks.

Schematic illustration of the engineering scope.

Period
December 2017 — May 2019
Funding
IBRD / World Bank, UDHEEP
KES’s role
Documentation prepared in consortium with COWI.
Kherson

The task and
engineering context

An engineering basis for subsequent procurement and implementation within the agreed design contract.

This case concerns design and tender documentation. The listed facilities are not a claim that KES constructed them.

Scope of works

  • Documentation for 15 boiler plants.
  • Documentation for 13 individual heat substations.
  • Heat network design scope of 8,816 metres.

Figures are based on company materials and the ReBuild presentation dated 21 October 2026. Scope and role are stated for each project.